A long pause. “Because that geothermal loop was never approved. But someone built over it anyway. Parcel 14 has been sinking 2 cm per year since 2015. The official reports are altered. The new master plan PDF — the one they circulate — shows fill layers that don’t exist.”
He filed an anonymous report, attaching both PDFs — the hidden 2003 version and the official 2022 version — with a simple note: “Compare Parcel 14 elevations. One of these plans is a lie.” Three weeks later, a small engineering crew arrived with ground-penetrating radar. They found it: a 200-meter loop of corroded, unpermitted geothermal piping, installed during the original infrastructure phase, capped but leaking brine. The saltwater had been slowly dissolving the caliche layer beneath the supermarket’s foundation. Jvc Master Plan Pdf
“Why?”